Concrete & foundations
Footings, slabs, walls, and elevated decks quantified by cubic yard, with rebar, formwork, and finishing measured from the structural set.

Your Buildbid agent reads the architectural and structural drawings and specs, then returns a division-by-division estimate — priced at your rates, in minutes.
Quantities come off your drawings and specs. Costs come from your book and your subs. Nothing is filled in from a per-square-foot average.
Footings, slabs, walls, and elevated decks quantified by cubic yard, with rebar, formwork, and finishing measured from the structural set.
Steel tonnage, metal stud and wood framing, sheathing, and connections taken off by member and level, ready for your rates or a sub quote.
Wall assemblies, insulation, air barriers, cladding, and roofing systems measured by area and edge, with flashing and penetrations counted.
Openings matched to the door schedule, with frames, hardware sets, and glazing priced per opening instead of per allowance.
Drywall, ceilings, flooring, paint, and millwork measured by room from the finish schedule, so the finish budget reflects the drawings.
Every spec section mapped to a self-perform line or a sub, so holes and overlaps between bid packages show up before bid day.
Supervision, temporary facilities, equipment, cleanup, and insurance built from the schedule duration, not a flat percentage.
Alternates, unit prices, and allowances pulled from the bid form and priced separately, so the base bid stays clean.
Every assembly with units, locations, and the drawing it came from, organized by CSI division.
Sub quotes side by side against the scope, so you carry the right number, not just the lowest one.
Time-driven costs tied to the schedule, so a longer job gets priced as one.
Labor, material, fee, and contingency you set — applied the same way on every bid.
And the summary: a bid you can defend line by line, out the door before the addendum deadline.
Four assumptions that decide whether a building bid makes margin. Your agent makes each one explicit, priced, and visible before you submit.
Blocking, firestopping, and cleanup that every sub excludes end up in your fee.
A flat GC percentage ignores schedule length — and the job that runs long pays for it.
A late addendum that never made it into every sub's quote becomes a change you can't bill.
Allowances priced too low on bid day become the owner conversation you don't want at closeout.
Tell us how you price building work — your assemblies, labor rates, sub relationships, fee, and markups. We train a custom AI agent on your way of bidding.
Upload the drawings, specs, and addenda. Your agent reads them and builds a detailed takeoff by division.
Review quantities, sub coverage, and a complete line-item estimate in a fraction of the usual time — then tweak, approve, and send the bid.
Whether you're a general contractor or self-performing builder, a reliable construction estimate follows the same order. Here is how to bid construction jobs.
Read the drawings, specs, bid form, and addenda before measuring anything. Note alternates, unit prices, allowances, and the schedule.
Measure concrete, framing, envelope, openings, and finishes division by division, keeping each quantity tied to the sheet it came from.
Assign every spec section to your own crews or a subcontractor so nothing is missing between bid packages.
Compare sub bids side by side against the same scope. The lowest number is often low because something is excluded.
Build supervision, temporary facilities, equipment, and cleanup from the job duration instead of a flat percentage.
Apply your overhead, fee, contingency, insurance, and bond costs the same way on every bid so your numbers stay comparable.
Through a quantity takeoff priced with labor, material, and equipment rates, plus subcontractor quotes, general conditions, and markup.
Scope gaps between subcontractors, general conditions that ignore schedule length, and allowances that don't match the drawings.
Buildbid.ai builds a custom AI agent that does these steps on your plans, at your rates, so every construction bid goes out faster and more consistent.
Read the full construction estimating guide →Send us a set of drawings and how you build up a bid today. We'll show you the takeoff and the number a custom Buildbid agent comes back with.